Skip to content

Traffic Impacts Update for Route 11 Resurfacing Project in Berwick

Below is the  latest travel information for the Route 11 resurfacing/reconstruction project in Berwick.

PennDOT’s contractor (Barletta Materials & Construction, Inc.) will be closing the Berwick-Nescopeck River Bridge this weekend to reconstruct a section of Route 93 between the bridge and Front Street (Route 11 northbound). The bridge will be closed Friday evening, June 15 at 10 p.m. and reopened to traffic by Sunday evening, June 17 at 10 p.m.

A signed detour will be implemented using Route 339 (Broad Street in Nescopeck) to Route 2028 (Market Street in Mifflinville) to Route 11.

This work is the second of three stages designed to reconstruct the Market Street intersections with Front and Second streets. It should be noted that this work does not have the final layer of blacktop applied yet. That phase will happen at a later date after reconstruction of the third stage (right-hand lane of Second Street at Market Street) is completed. That work has not yet been scheduled.

Scroll To Top